Energy commissioning QA
*Leyoxa Verify starts with AI data centers. The same checks apply here, and this is where we go next.*
Solar, battery storage, substations and on-site power all end the same way: thousands of connections that have to be right before the system is energized. Leyoxa Verify checks them, reads the test results, and writes the handover.
Where it helps
- Battery storage. Busbar joints, DC and AC wiring and auxiliary systems checked before energization, then watched under the first charge and discharge cycles.
- Solar. String test results and IV curves read across the whole plant, with the string that passes but underperforms its peers flagged, checked against IEC 62446 limits.
- Substations and switchyards. Terminations, labels and relay and breaker test results checked against the design, with thermal scans under first load.
- On-site power for data centers. Switchgear, transformers and generator connections verified before the facility depends on them.
Why now
In EPRI’s database of battery storage failures, 72% of failures with a known system age happened during construction, commissioning or the first two years of operation, and most traced to build quality in wiring, cooling and safety systems (EPRI with TWAICE and PNNL, 2024). The cheapest place to catch them is before energization.
On a live site
- Alongside your crew. It captures, checks and documents; your testers decide.
- Safe by design. Per NFPA 70E, with thermal under load through IR windows or with qualified staff.
- Built for big yards. On a cart or in a technician’s hand first; a robot for repeated sweeps across large outdoor sites.
We work in the United States, Canada and the Middle East. Book a pilot on one yard or substation.
Updated · Read as markdown
Energizing soon?
Tell us the build, the country and your commissioning dates. We’ll come back with a pilot plan and a price.
Book a pilot